McAleer Creek Culvert

McAleer Creek Culvert

McAleer Creek Culvert

Installation of 3 bridges across McAleer Creek at the Nile Golf Course including 1 pre-cast concrete bridge and 2 pre-fabricated steel truss bridges.

Owner: City of Mountlake Terrace
Engineer: Perteet Engineering/Shearer Design

Permalink Gallery

Lift Station No. 10

Lift Station No. 10

Lift Station No. 10

Abandonment of an existing lift station and installation of new 18″ DI sewer line inside of a 54″ concrete casing in excess of 36′ deep to connect to the Metro Sewer at the shoreline of Lake Washington. Work included extensive dewatering, deep shaft construction, winter creek bypass, sewer bypass pumping, pipe jacking, microtunneling and deep open-cut sewer installation.

Owner: Northshore Utility District
Engineer: Gray & Osborne

Permalink Gallery

Valley View Middle School

Valley View Middle School

Valley View Middle School

Construction of site utilities for a new middle school for Snohomish School District in highly sensitive soil conditions with a short schedule duration; work included construction of 2 large diameter pipe retention systems located in the new football field.

Owner: Snohomish School District General
Contractor: Absher Construction
Engineer: Dykeman

Permalink Gallery

SWM Drainage Improvements

SWM Drainage Improvements

SWM Drainage Improvements

Construction of a 24′ wide X 12′ tall multi-plate arch culvert approximately 25′ deep; included roadway reconstruction during a short construction window.

Owner: Snohomish County
Engineer: Snohomish County Engineering

Permalink Gallery

Big Gulch

Big Gulch

Big Gulch

Installation of a 25′ x 30′ three-side box culvert over Big Gulch Creek while maintaining access to the MWWD facility; completion of wetland and landscape restoration from previous sewer contracts.

Owner: Mukilteo Water and Wastewater District
Engineer: Hammond Collier Wade Livingstone

Permalink Gallery

MGHS Frontage Improvements

MGHS Frontage Improvements

MGHS Frontage Improvements

Installation of sewer, storm, water and third party utilities as part of the frontage improvements for the Marysville Getchell High School; included deep utility installation through the winter months and extensive relocation of existing third party utilities.

Owner: Marysville School District
Engineer: Saez Engineering