Skip to main content
Hit enter to search or ESC to close
Close Search
New West Development
Menu
  • Home
  • About Us
    • Careers
  • Services
  • Projects
  • Our Blog
  • Contact Us
  • linkedin

McAleer Creek Culvert

 
 
 
 
 
 
 
1
1

McAleer Creek Culvert Replacment

Installation of 3 bridges crossing a creek at the Nile Golf Course. Bridge #1 is a pre-cast concrete
culvert procured from Granite Precasting. Bridges #2 and #3 were prefabricated steel truss
bridges procured from Contech.

Spotlight
Bridge and culvert construction. Environmentally sensitive construction techniques.

Situation
Working within an active streambed on an active golf course within ball flight path and play.

Results
Bridge #1 was completed during the summer fish window in 2013; Bridges #2 and #3 were
completed during the summer fish window in 2014.

Acknowledgements

Owner: City of Mountlake Terrace
Contractor: New West Development Inc.
Engineer: Perteet Engineering/Shearer Design

  • Previous ProjectMadison Stream Bank Restoration and Wall Construction

  • Next ProjectMarinwood Residential

Share Tweet Share Pin

New West Development, Inc. is a full-service site development contractor. We are federally certified as a Small Business Enterprise through Washington State OMWBE and are prequalified to bid on WSDOT projects.

Let’s chat

Stop by: 2417 119th St SW, Everett, WA 98146
Call us: 425.249.2382
Fax us: 425.249.2383
Email: [email protected]

© 2025 New West Development. Website powered by Integrity Marketing. Privacy Policy.

Close Menu
  • Home
  • About Us
    • Careers
  • Services
  • Projects
  • Our Blog
  • Contact Us

New West Development

2417 119th St SW
Everett, WA 98204

T: 425.249.2382
E: [email protected]

  • linkedin