McAleer Creek Culvert Replacment
Installation of 3 bridges crossing a creek at the Nile Golf Course. Bridge #1 is a pre-cast concrete
culvert procured from Granite Precasting. Bridges #2 and #3 were prefabricated steel truss
bridges procured from Contech.
Spotlight
Bridge and culvert construction. Environmentally sensitive construction techniques.
Situation
Working within an active streambed on an active golf course within ball flight path and play.
Results
Bridge #1 was completed during the summer fish window in 2013; Bridges #2 and #3 were
completed during the summer fish window in 2014.
Acknowledgements
Owner: City of Mountlake Terrace
Contractor: New West Development Inc.
Engineer: Perteet Engineering/Shearer Design