Construction of a 24’ wide X 12’ tall multi-plate arch culvert approximately 25’ deep. Reconstruct the roadway, pave and install guardrail.
Spotlight Bridge and culvert construction. Environmentally sensitive construction techniques.
Problem Installation of significant large work required in a one month schedule period.
Solution Proper sequencing and multi-tier communication.
Results Work completed within contractual time frame on schedule.
Acknowledgements Owner: Snohomish County Contractor: New West Development Inc. Engineer: Snohomish county Engineering
2417 119th St SW Everett, WA 98204
T: 425.249.2382 E: [email protected]